Push-barge Thor
The project consisted of the salvage and disposal of a barge loaded with construction plating. The contract was awarded to the Joint Venture between Mammoet Salvage and DISA International. The barge was successfully salvaged in two sections with the usage of the sheerlegs BRABO.